The Thin Ribbon Of The Veridian Trail |
Instead of joining the throngs on the Tandy Hills I joined the throngs at River Legacy Park and had myself a real fine time going on a real long bike ride.
The orange cones that had been blocking entry from the River Legacy trail to the new paved trail that trails off into the Veridian Project had been set aside.
So, I pedaled that new Veridian trail until it terminated.
The End Of The Veridian Trail |
I have to say it was fun biking on this trail, going real fast.
The parking lot where I usually park at River Legacy Park was full tonight. The park was way busier than my mid-week visits. But the traffic on the trails was not quite as frenetic.
I was quite impressed with the number of over inflated people out getting themselves some exercise tonight. There was one really big pair at the end of the trail, the 7 mile mark. They did not appear to move too fast. I hope they made it back to their vehicular transport before it got too dark.
No comments:
Post a Comment